Permit: T06BU01328

Parcel: 132130570


Addresses:

1051 E BENSON HY

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
09/21/2007 STORMWATER FOLLOW-UP INSP Approved All areas stabilized.
08/01/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor needs to address:
1- Address spillway on the southwest basin.
2- Address erosion in drainage channel southwest side of project.
Spoke to site super in regards to. If not addressed I will issue a notice of violation.
05/16/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to keep wash out cleaned up.
05/09/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to install controls for north basin inlets. Spoke to site super in regards to.
02/12/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to:
1- Remove broken hay bales from drainage channel. Next to Benson Highway.
2- Clean up wash out north side of property, next to fence.
3- Repair wash bank north side of project.
Spoke to site super.
12/18/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Compact berm a long Benson.
2- Replace damaged straw bales. Northside.
3- Install silt fence a long wash. Northside of project.
4- Repair wash bank damaged by construction.
5- Remove spoil material a long property line with Motel 6.