Inspection History Details
Inspection Status: Correction Required
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T06BU01253
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/13/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SCE AT CONCRETE WASHOUT NEEDED | |
06/23/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | ONE NEW START | |
03/17/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | NO SIGN ON CONCRETE WASH OUT AT S SIDE OF SITE | |
10/02/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SEE PICS 2694-2705 SWEEP STREETS AND PLACE CURBSIDE BMPS |
|
01/08/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | SIERRA PACIFIC SWEEP STREETS AT ALL ACTIVE LOTS NO MORE CONCRETE, STUCCO, MORTAR WASHOUT ON VACANT LOTS |
|
01/08/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | TJ BEDNAR NO CONCERNS AT THIS TIME |
|
11/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SIERRA PACIFIC NO CONCERNS AT THIS TIME |
|
11/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | TJ BEDNAR NO CHANGE IN SITE SWPPP HAS BEEN RE-SUBMITTED |
|
10/04/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | TJ BEDNAR NO CORRECTIONS HAVE BEEN MADE-CALLED AND LEFT LARRY SCHROEDER A MESSAGE |
|
10/04/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SIERRA PACIFIC NO CONCERNS AT THIS TIME |
|
09/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SIERRA PACIFIC CORRECTION NOTICE 7 DAYS -DUMPSTER NEEDED LOT 214 |
|
09/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED MET SITE SUPER SHANNON -PLACE CONTROLS AT ALL STOCKPILES -SWEEP BRUSHBACK LP -PLACE S.C.E. ON TATE LP TO PREVENT TRACK OUT -CLEAN UP DEBRIS ON LOT 219 |
|
09/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SIERRA PACIFIC -PLACE ALL CONSTRUCTION DEBRIS IN DUMPSTERS -CURBSIDE BMPS AT ALL VERTICAL LOTS |
|
08/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SIERRA PACIFIC CORRECTION NOTICE 5 DAYS -CURBSIDE BMPS NEED TO BE PLACED ALL LOTS -SWEEP SITE -REMOVE ALL SEDIMENT IN ROW AREA *STOCKPILES NOT PROTECTED *NO CONCRETE WASH OUT ON SITE *SECOND NOTICE |
|
08/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR CORRECTION NOTICE ISSUED 5 DAYS -CURBSIDE BMPS NEED TO BE PLACED -STOCKPILES NOT PROTECTED -SWEEP STREETS -SWPPP STILL NOT APPROVED-MUST BE RESUBMITTED TO COT |
|
08/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE TO SIERRA PACIFIC 10 DAYS SEE PICS 997-1000 -REMOVE/PROTECT STOCKPILES -PLACE CONCRETE WASH OUT (COMPLETE WITH SIGN) -CLEAN UP CONCRETE WASH OUT AT VEDDER/KOUFAX -PLACE SEDIMENT CONTROLS BEHIND CURB -PLACE DUMPSTERS AT EACH ACTIVE LOT |
|
08/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | -SWEEP STREETS -PLACE SEDIMENT/EROSION CONTROLS BEHIND CURB -PROTECT/PLACE SEDIMENT CONTROLS AT ALL STOCKPILES -COMPLETE PAVING AT ALL OPEN STREET CUTS |
|
07/26/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SEE PICS 633-638 CALLED ERIC CHENEY WITH SIERRA PACIFIC-V DITCHES TO BE CUT BEHIND CURB IN THEIR SECTION OF THIS JOB TO PREVENT EROSION/SEDIMENT INTO STREET STANDING WATER IN SIERRA PACIFIC SECTION TJ BEDNAR NEEDS TO SWEEP BRUSHBACK LOOP RESET WATTLE AT DRAINAGE WAY WEST OF SALES OFFICE SWEEP ROADWAY IN FRONT OF ALL WORK AREAS MAINTAIN AND SIGN CONCRETE WASH OUT REMOVE ALL SPOIL FROM ROADWAY PLACE SEDIMENT CONTROLS AT ALL STOCKPILES/SPOIL PILES |
|
07/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | LARRY OR JOSE NOT ON SITE ALMOST ALL PATCHES COMPLETE IN THE SIERRA PACIFIC PORTION OF THIS SITE SPOIL STILL SPILLING OUT OVER CURB |
|
06/28/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | MET WITH JOSE ON SITE NOI STILL NOT POSTED |
|
06/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SEE PICS 374-384 PER LARRY (CONST MGR TJ BEDNAR) -SWEEPING IS SCHD FOR EVERY FRIDAY TO ADDRESS 6/26 CONCERNS -LABORERS SWEEPING -PER LARRY NOI WAS BEING COPIED TO BE POSTED 6/28 -SWPPP TO BE POSTED FOR SIERRA PACIFIC SITE FOLLOW UP INSP 6/28 |
|
06/26/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CALLED AND LEFT MESSAGE FOR ED CRADDOCK TO CALL ME -NO NOI/SWPPP POSTING AT SIERRA PACIFIC SIDE -SITE STILL NEEDS SWEEPING-STREET CUTS NOT PAVED/PATCHED -SIGNS OF STANDING WATER IN SW BASIN -SCE NEEDS TO BE EXTENDED TO WILMOT -SPOIL PILE IN ROADWAY (BRUSHBACK LP) 2 LOCATIONS -SEDIMENT CONTROLS NEED TO BE PLACED AROUND WATER METER -CONCRETE WASH OUT NEEDS MAINTENANCE AND A SIGN TALKED TO LARRY (CONST MGR 248-1574) AND JOSE (SITE SUPER) GAVE THEM A STORMWATER PACKET AND DISCUSSED THE DEFICIENCIES AT THIS SITE I WILL RETURN 6/27 TO VERIFY ISSUES HAVE BEEN ADDRESSED- STOP WORK ORDER IS THE NEXT STEP FOR THIS SITE THE SWPPP PLAN HAS BEEN RETURNED FOR CORRECTIONS 6/23 COMMENTS AS FOLLOWS: To: Jeff Stanley DATE: June 22, 2006 Stanley Engineering & Drainage P.O. Box 1888 Tucson, Arizona 85702-1888 SUBJECT: Vista Montana Estates, 6348 E. Stadium Parkway Stormwater Pollution Prevention Plan (1st Review) T15S, R15E, Section 19 RESUBMITTAL REQUIRED: Stormwater Pollution Prevention Plan The Stormwater Pollution Prevention Plan (SWPPP) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Stormwater pollution prevention plan: 1. Submit 3 copies of the SWPPP and 1 copy of the grading plan with the revisions. Site Map 1. Show, on the site map, directions of stormwater flow (e.g., use arrows to show which ways stormwater will flow) and approximate slopes anticipated after major grading activities. (Part IV.C.3.a). Show the designated concrete washout area. 2. Show, on the site map, areas of soil disturbance and areas that will not be disturbed. (Part IV.C.3.b) 3. Show, on the site map, locations of structural and nonstructural controls identified in the SWPPP. (Part IV.C.3.c) 4. Show, on the site map, locations where stabilization practices are expected to occur. (Part IV.C.3.d). It is not clear where the BMP are to occur on the down stream slope of the site. The BMP's shall be continuous along the lower portion of the site. The BMP's shown are only intermittently. Structural Practices 5. Provide adequate sediment basins. (Part IV.D.5.a.) a. For drainage locations serving less than 10 acres, smaller sediment basins and/or sediment traps shall be used. Silt fences, vegetative buffer strips, or equivalent sediment controls are required for all down slope boundaries (and for those side slope boundaries deemed appropriate as dictated by individual site conditions) of the construction area unless a sediment basin providing storage for a calculated volume of runoff from a 2 year, 24 hour storm or 3,600 cubic feet of storage per acre drained is provided. 6. Place velocity dissipation devices at discharge locations and along the length of any outfall channel to provide a non-erosive flow velocity from the structure to a water course so that the natural physical and biological characteristics and functions are maintained and protected (e.g. no significant changes in the hydrological regime of the receiving water). (Part IV.D.5.b) Note: The velocity dissipation devices must be in place during the construction phases. Installation scheduling must be included and should be as early as practicable. 7. Describe post-construction storm water management measures that will be installed during the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures shall be placed on upland soils to the degree attainable. Such measures must be designed and installed consistent with applicable local or state stormwater management requirements. (Part IV.D.6) Non-Stormwater Discharges 8. Describe measures to minimize off-site vehicle tracking of sediments. (Part IV.D.8.b). Provide all entrances being used as construction access with a stabilized surface or narrow down the entrances to the one with the stabilized surface. Permit Related Records 9. Include a copy of the general permit and the NOI that was or will be submitted to ADEQ. If other agreements with any state, local, or federal agencies exist that would affect the provisions or implementation of the SWPPP, include copies of those agreements. (Part IV.F) 10. The grading plan and landscape plan may be incorporated into the SWPPP by reference. The requirements of the plans must be treated by the operator as part of the SWPPP. (Part IV.G). Include 1 copy of the stamped approved grading plans with the re-submittal. Inspections 11. Provide example forms for Compliance Evaluation Reports (Inspection Reports). At a minimum the forms must include: a. The inspection date. (Part IV.H.5.a) b. Name(s) and title(s) and qualifications of person(s) making the inspection. Qualifications must either be on/attached to the report or alternatively, if the SWPPP documents the qualifications of the inspectors by name, that portion of the SWPPP may be referenced. (Part IV.H.5.b) c. Weather information for the period since the last inspection (or since commencement of construction activity if the first inspection), including best estimate of the beginning of each storm event, duration of each event, time elapsed since last storm event, and approximate amount of rainfall for each event (in inches) . (Part IV.H.5.c) d. Location(s) of discharges of sediment or other pollutants from the site. (Part IV.H.5.d) e. Location(s) and identification of BMPs that need to be maintained; failed to operate as designed or prove inadequate. (Part IV.H.5.e) f. Location(s) where additional BMPs that do not exist at the time of inspection are needed. ((Part IV.H.5.f) g. Corrective actions required, including any changes to SWPPP necessary and implementation dates. (Part IV.H.5.g) h. Identification of all sources of non-storm water and the associated pollution prevention control measures. (Part IV.H.5.h) i. Identification of material storage areas and, evidence of or potential for, pollutant discharge from such areas. (Part IV.H.5.i) j. Compliance certification statement. (Part IV.H.6) k. Signature line with certification statement. (Part IV.H.6) Signature Requirements 12. Include a certification and signature for each operator in accordance with Part VII.K. (Part IV.J.1). Include the certification with the appropriate signature in the re-submittal. 13. All NOIs must be signed and certified as follows: a) For a corporation: By a responsible corporate officer. For the purpose of this Part, a responsible corporate officer means: i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; or ii) The manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. b) For a partnership or sole proprietorship: By a general partner or the proprietor, respectively; or c) For a municipality, state, federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this section, a principal executive officer of a Federal agency is the chief executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g. Regional Administrators of EPA.). If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 791-5550 x1193 office (520) 879-8010 fax C:/6348 E. Stadium Parkway SWPPP |
|
06/20/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CALLED ED CRADDOCK AND ADVISED SPOIL IN STREETS PER ED NOI IS APPROVED AND WILL BE POSTED 6/21 |
|
06/08/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | VERIFIED NOI POSTING-SWPPP IS IN BOX BEHIND SIGN STREET CUTS ARE STILL THERE TRACK OUT ON STREET-HOUSING SUPER IS AWARE TRACK OUT NEEDS TO BE SWEPT DAILY |
|
06/06/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE STILL IN POOR SHAPE-DIRT ON ALL THE STREETS STILL NOT ADDRESSED |