Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T06BU01253

Parcel: 141094670


Addresses:

6348 E STADIUM PW


Inspection Status: Correction Required

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T06BU01253

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Correction Required

Date Description Inspector Results Comments
08/13/2008 STORMWATER FOLLOW-UP INSP Correction Required SCE AT CONCRETE WASHOUT NEEDED
06/23/2008 STORMWATER FOLLOW-UP INSP Partial Approval ONE NEW START
03/17/2008 STORMWATER FOLLOW-UP INSP Correction Required NO SIGN ON CONCRETE WASH OUT AT S SIDE OF SITE
10/02/2007 STORMWATER FOLLOW-UP INSP Correction Required SEE PICS 2694-2705

SWEEP STREETS AND PLACE CURBSIDE BMPS
01/08/2007 STORMWATER FOLLOW-UP INSP Partial Approval SIERRA PACIFIC
SWEEP STREETS AT ALL ACTIVE LOTS
NO MORE CONCRETE, STUCCO, MORTAR WASHOUT ON VACANT LOTS
01/08/2007 STORMWATER FOLLOW-UP INSP Partial Approval TJ BEDNAR
NO CONCERNS AT THIS TIME
11/02/2006 STORMWATER FOLLOW-UP INSP Partial Approval SIERRA PACIFIC

NO CONCERNS AT THIS TIME
11/02/2006 STORMWATER FOLLOW-UP INSP Partial Approval TJ BEDNAR

NO CHANGE IN SITE
SWPPP HAS BEEN RE-SUBMITTED
10/04/2006 STORMWATER FOLLOW-UP INSP Partial Approval TJ BEDNAR

NO CORRECTIONS HAVE BEEN MADE-CALLED AND LEFT LARRY SCHROEDER A MESSAGE
10/04/2006 STORMWATER FOLLOW-UP INSP Partial Approval SIERRA PACIFIC

NO CONCERNS AT THIS TIME
09/18/2006 STORMWATER FOLLOW-UP INSP Correction Required SIERRA PACIFIC CORRECTION NOTICE 7 DAYS
-DUMPSTER NEEDED LOT 214
09/05/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED
MET SITE SUPER SHANNON

-PLACE CONTROLS AT ALL STOCKPILES
-SWEEP BRUSHBACK LP
-PLACE S.C.E. ON TATE LP TO PREVENT TRACK OUT
-CLEAN UP DEBRIS ON LOT 219
09/05/2006 STORMWATER FOLLOW-UP INSP Correction Required SIERRA PACIFIC

-PLACE ALL CONSTRUCTION DEBRIS IN DUMPSTERS
-CURBSIDE BMPS AT ALL VERTICAL LOTS
08/23/2006 STORMWATER FOLLOW-UP INSP Correction Required SIERRA PACIFIC
CORRECTION NOTICE 5 DAYS

-CURBSIDE BMPS NEED TO BE PLACED ALL LOTS
-SWEEP SITE
-REMOVE ALL SEDIMENT IN ROW AREA
*STOCKPILES NOT PROTECTED
*NO CONCRETE WASH OUT ON SITE

*SECOND NOTICE
08/23/2006 STORMWATER FOLLOW-UP INSP Correction Required TJ BEDNAR
CORRECTION NOTICE ISSUED 5 DAYS

-CURBSIDE BMPS NEED TO BE PLACED
-STOCKPILES NOT PROTECTED
-SWEEP STREETS
-SWPPP STILL NOT APPROVED-MUST BE RESUBMITTED TO COT
08/11/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE TO SIERRA PACIFIC 10 DAYS
SEE PICS 997-1000

-REMOVE/PROTECT STOCKPILES
-PLACE CONCRETE WASH OUT (COMPLETE WITH SIGN)
-CLEAN UP CONCRETE WASH OUT AT VEDDER/KOUFAX
-PLACE SEDIMENT CONTROLS BEHIND CURB
-PLACE DUMPSTERS AT EACH ACTIVE LOT
08/04/2006 STORMWATER FOLLOW-UP INSP Correction Required -SWEEP STREETS
-PLACE SEDIMENT/EROSION CONTROLS BEHIND CURB
-PROTECT/PLACE SEDIMENT CONTROLS AT ALL STOCKPILES
-COMPLETE PAVING AT ALL OPEN STREET CUTS
07/26/2006 STORMWATER FOLLOW-UP INSP Correction Required SEE PICS 633-638
CALLED ERIC CHENEY WITH SIERRA PACIFIC-V DITCHES TO BE CUT BEHIND CURB IN THEIR SECTION OF THIS JOB TO PREVENT EROSION/SEDIMENT INTO STREET

STANDING WATER IN SIERRA PACIFIC SECTION
TJ BEDNAR NEEDS TO SWEEP BRUSHBACK LOOP
RESET WATTLE AT DRAINAGE WAY WEST OF SALES OFFICE
SWEEP ROADWAY IN FRONT OF ALL WORK AREAS
MAINTAIN AND SIGN CONCRETE WASH OUT
REMOVE ALL SPOIL FROM ROADWAY
PLACE SEDIMENT CONTROLS AT ALL STOCKPILES/SPOIL PILES
07/11/2006 STORMWATER FOLLOW-UP INSP Correction Required LARRY OR JOSE NOT ON SITE
ALMOST ALL PATCHES COMPLETE IN THE SIERRA PACIFIC PORTION OF THIS SITE
SPOIL STILL SPILLING OUT OVER CURB
06/28/2006 STORMWATER FOLLOW-UP INSP Correction Required MET WITH JOSE ON SITE
NOI STILL NOT POSTED
06/27/2006 STORMWATER FOLLOW-UP INSP Correction Required SEE PICS 374-384
PER LARRY (CONST MGR TJ BEDNAR)
-SWEEPING IS SCHD FOR EVERY FRIDAY

TO ADDRESS 6/26 CONCERNS
-LABORERS SWEEPING
-PER LARRY NOI WAS BEING COPIED TO BE POSTED 6/28
-SWPPP TO BE POSTED FOR SIERRA PACIFIC SITE

FOLLOW UP INSP 6/28
06/26/2006 STORMWATER FOLLOW-UP INSP Correction Required CALLED AND LEFT MESSAGE FOR ED CRADDOCK TO CALL ME

-NO NOI/SWPPP POSTING AT SIERRA PACIFIC SIDE
-SITE STILL NEEDS SWEEPING-STREET CUTS NOT PAVED/PATCHED
-SIGNS OF STANDING WATER IN SW BASIN
-SCE NEEDS TO BE EXTENDED TO WILMOT
-SPOIL PILE IN ROADWAY (BRUSHBACK LP) 2 LOCATIONS
-SEDIMENT CONTROLS NEED TO BE PLACED AROUND WATER METER
-CONCRETE WASH OUT NEEDS MAINTENANCE AND A SIGN

TALKED TO LARRY (CONST MGR 248-1574) AND JOSE (SITE SUPER) GAVE THEM A STORMWATER PACKET AND DISCUSSED THE DEFICIENCIES AT THIS SITE

I WILL RETURN 6/27 TO VERIFY ISSUES HAVE BEEN ADDRESSED- STOP WORK ORDER IS THE NEXT STEP FOR THIS SITE

THE SWPPP PLAN HAS BEEN RETURNED FOR CORRECTIONS 6/23
COMMENTS AS FOLLOWS:

To: Jeff Stanley DATE: June 22, 2006
Stanley Engineering & Drainage
P.O. Box 1888
Tucson, Arizona 85702-1888
SUBJECT: Vista Montana Estates, 6348 E. Stadium Parkway
Stormwater Pollution Prevention Plan (1st Review)
T15S, R15E, Section 19

RESUBMITTAL REQUIRED: Stormwater Pollution Prevention Plan

The Stormwater Pollution Prevention Plan (SWPPP) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Stormwater pollution prevention plan:
1. Submit 3 copies of the SWPPP and 1 copy of the grading plan with the revisions.
Site Map
1. Show, on the site map, directions of stormwater flow (e.g., use arrows to show which ways stormwater will flow) and approximate slopes anticipated after major grading activities. (Part IV.C.3.a). Show the designated concrete washout area.
2. Show, on the site map, areas of soil disturbance and areas that will not be disturbed. (Part IV.C.3.b)
3. Show, on the site map, locations of structural and nonstructural controls identified in the SWPPP. (Part IV.C.3.c)
4. Show, on the site map, locations where stabilization practices are expected to occur. (Part IV.C.3.d). It is not clear where the BMP are to occur on the down stream slope of the site. The BMP's shall be continuous along the lower portion of the site. The BMP's shown are only intermittently.
Structural Practices
5. Provide adequate sediment basins. (Part IV.D.5.a.)
a. For drainage locations serving less than 10 acres, smaller sediment basins and/or sediment traps shall be used. Silt fences, vegetative buffer strips, or equivalent sediment controls are required for all down slope boundaries (and for those side slope boundaries deemed appropriate as dictated by individual site conditions) of the construction area unless a sediment basin providing storage for a calculated volume of runoff from a 2 year, 24 hour storm or 3,600 cubic feet of storage per acre drained is provided.
6. Place velocity dissipation devices at discharge locations and along the length of any outfall channel to provide a non-erosive flow velocity from the structure to a water course so that the natural physical and biological characteristics and functions are maintained and protected (e.g. no significant changes in the hydrological regime of the receiving water). (Part IV.D.5.b)
Note: The velocity dissipation devices must be in place during the construction phases. Installation scheduling must be included and should be as early as practicable.
7. Describe post-construction storm water management measures that will be installed during the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures shall be placed on upland soils to the degree attainable. Such measures must be designed and installed consistent with applicable local or state stormwater management requirements. (Part IV.D.6)
Non-Stormwater Discharges
8. Describe measures to minimize off-site vehicle tracking of sediments. (Part IV.D.8.b). Provide all entrances being used as construction access with a stabilized surface or narrow down the entrances to the one with the stabilized surface.

Permit Related Records
9. Include a copy of the general permit and the NOI that was or will be submitted to ADEQ. If other agreements with any state, local, or federal agencies exist that would affect the provisions or implementation of the SWPPP, include copies of those agreements. (Part IV.F)
10. The grading plan and landscape plan may be incorporated into the SWPPP by reference. The requirements of the plans must be treated by the operator as part of the SWPPP. (Part IV.G). Include 1 copy of the stamped approved grading plans with the re-submittal.

Inspections
11. Provide example forms for Compliance Evaluation Reports (Inspection Reports). At a minimum the forms must include:
a. The inspection date. (Part IV.H.5.a)
b. Name(s) and title(s) and qualifications of person(s) making the inspection. Qualifications must either be on/attached to the report or alternatively, if the SWPPP documents the qualifications of the inspectors by name, that portion of the SWPPP may be referenced. (Part IV.H.5.b)
c. Weather information for the period since the last inspection (or since commencement of construction activity if the first inspection), including best estimate of the beginning of each storm event, duration of each event, time elapsed since last storm event, and approximate amount of rainfall for each event (in inches) . (Part IV.H.5.c)
d. Location(s) of discharges of sediment or other pollutants from the site. (Part IV.H.5.d)
e. Location(s) and identification of BMPs that need to be maintained; failed to operate as designed or prove inadequate. (Part IV.H.5.e)
f. Location(s) where additional BMPs that do not exist at the time of inspection are needed. ((Part IV.H.5.f)
g. Corrective actions required, including any changes to SWPPP necessary and implementation dates. (Part IV.H.5.g)
h. Identification of all sources of non-storm water and the associated pollution prevention control measures. (Part IV.H.5.h)
i. Identification of material storage areas and, evidence of or potential for, pollutant discharge from such areas. (Part IV.H.5.i)
j. Compliance certification statement. (Part IV.H.6)
k. Signature line with certification statement. (Part IV.H.6)

Signature Requirements
12. Include a certification and signature for each operator in accordance with Part VII.K. (Part IV.J.1). Include the certification with the appropriate signature in the re-submittal.
13. All NOIs must be signed and certified as follows:
a) For a corporation: By a responsible corporate officer. For the purpose of this Part, a responsible corporate officer means:
i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; or
ii) The manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.
b) For a partnership or sole proprietorship: By a general partner or the proprietor, respectively; or
c) For a municipality, state, federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this section, a principal executive officer of a Federal agency is the chief executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g. Regional Administrators of EPA.).

If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 791-5550 x1193 office
(520) 879-8010 fax
C:/6348 E. Stadium Parkway SWPPP
06/20/2006 STORMWATER FOLLOW-UP INSP Correction Required CALLED ED CRADDOCK AND ADVISED SPOIL IN STREETS
PER ED NOI IS APPROVED AND WILL BE POSTED 6/21
06/08/2006 STORMWATER FOLLOW-UP INSP Correction Required VERIFIED NOI POSTING-SWPPP IS IN BOX BEHIND SIGN

STREET CUTS ARE STILL THERE
TRACK OUT ON STREET-HOUSING SUPER IS AWARE TRACK OUT NEEDS TO BE SWEPT DAILY
06/06/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE STILL IN POOR SHAPE-DIRT ON ALL THE STREETS STILL NOT ADDRESSED