Permit: T06BU01155

Parcel: 105097340

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T06BU01155

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
09/06/2007 STORMWATER FOLLOW-UP INSP Approved
06/21/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO NEW STORM WATER CONCERNS AT THIS TIME
05/31/2007 STORMWATER FOLLOW-UP INSP Partial Approval 1) ANY SIGNIFICANT CHANGES TO THE APPROVED GRADING PLAN MUST BE APPROVED BY THE CITY OF TUCSON
2) ENSURE WASTE CONCRETE AND CONSTRUCTION MATERIALS ARE DISPOSED OF PROPERLY.
3) PRIOR TO FINAL GRADING APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL DRAINAGE STRUCTURES, RET/DET BASINS, AND WATER HARVESTING AREAS ON SITE WERE BUILT IN ACCORDANCE WITH THE APPROVED PLANS.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
05/10/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
05/02/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
04/10/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CHANGES. BLOCK WALL INSTALLED ON PERIMETER, SOME CURBING INSTALLED. SITE NOT 100% STABILIZED, SOME STORM WATER CONTROLS STILL REQUIRED.
03/07/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/12/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
02/08/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
01/31/2007 STORMWATER FOLLOW-UP INSP Correction Required 1) RE-ESTABLISH ROCK ENTRANCE/EXIT.
2) STAKE DOWN WADDLE AT LOW SPOT ALONG EAST PERIMETER.
01/10/2007 STORMWATER FOLLOW-UP INSP Partial Approval 1) ENSURE SEDIMENT CONTROLS IN PLACE ARE ROUTINELY MAINTAINED.
2) SWEEP UP TRACKED MATERIAL PERIODICALLY.
3) CLEAN OUT CONCRETE WASH OUT WHEN FULL
4) DOCUMENT ALL SELF INSPECTIONS PERFORMED PER YOUR SWPPP.
12/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/29/2006 STORMWATER FOLLOW-UP INSP Partial Approval STORM WATER CONTROLS IN PLACE, AND HAVE BEEN MAINTAINED.
SOIL HAS BEEN TRACKED ONTO ROADWAY AT THE WEST ENTRANCE DUE TO THE CITY OF TUCSON WATER WORK.
SWEEP UP TRACKING ON A ROUTINE BASIS.
NO ADDITIONAL STORM WATER CONCERNS AT THIS TIME.