Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T06BU01113
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/15/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
08/17/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SOGNIFICANT CONCERNS AT THIS TIME | |
07/27/2009 | STORMWATER FOLLOW-UP INSP | Continued | 1) TWO COMPACT ONLY PARKING SPOTS WILL BE ADDED ALONG NORTH PERIMETER DUE TO LOCATION OF LIGHT POLE. 2) ENSURE STORM WATER ROOF DRAIN AND WATER HARVESTING AREA ALONG NW CORNER DRAINS AWAY FROM 3 FOOT GAP BETWEEN RETAINING WALL AND SCREEN WALL. 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
06/05/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
05/18/2009 | STORMWATER FOLLOW-UP INSP | Continued | < 1 ACRE NO SWPPP REQUIRED. 2-BLDGS BEING BUILT ON SITE. STABILIZED CONSTR. ENTRANCE INSTALLED. SWEEP UP TRACKING ROUTINELY CONTRACTOR OVER EXCAVATING FOUNDATION |
|
07/03/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. SWEEP ALL SOIL TRACKED OUT ONTO SPEEDWAY AND PUBLIC RIGHT OF WAY. IMMEDIATELY. 2. PROVIDE GRAVEL AT SITE EXIT TO CONTROL TRACK-OUT. 3. REPAIR DAMAGED CURB AND SIDEWALK IN PUBLIC RIGHT OF WAY. PROVIDE A SCHEDULE AND TIME FRAME FOR REPAIRS. 4. PROVIDE STRAW BALES AT NORTHEAST CORNER OF SITE FOR SWPP. CONTACTS: LAYNE LUNDEE (PROPERTY OWNER) 631-5000 BRIAN BEHAN (BEHAN EXCAVATION) 405-8222 |