Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2006 | STORMWATER INSTALL OF CONTROLS | Approved | ||
| 07/26/2006 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) TIE BOTTOM OF SILT FENCE INTO GROUND, FENCE SHOULD NOT HAVE DAYLIGHT UNDER FENCE. 2) SWEEP UP TRACKED SOIL AND SOIL FROM DISCHARGES ON WEST SIDE. |
|
| 07/13/2006 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) POST A COPY OF YOUR SIGNED NOI AT ENTRANCE. 2) PROTECT EXISTING CATCH BASIN ON WEST SIDE AT CONSTRUCTION ENTRANCE - CLEAN ROCK OUT OF BASIN, PREVENT MATERIAL FROM ENTERING STORM SEWER. 3) RE-ESTABLISH ALL ROCK ENTRANCES, ROUTINELY SWEEP UP TRACKED MATERIAL OFF OFPUBLIC ROADS. 4) INSTALL A CONCRETE/MATERIALS WASH OUT PER YOUR STORM WATER PLAN. 5) COMPLETE, DOCUMENT AND PROVIDE STORM WATER MAINTENANCE SELF INSPECTIONS AS REQUIRED BY YOUR STORM WATER PLAN. 10 WORKING DAY SUSPENSE |