Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T06BU01018
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2010 | GRADING - FINAL | Approved | Approved | |
01/25/2007 | GRADING - FINAL | Partial Approval | Contractor completed punch list and stabilized all areas. Contractor still cleaning up material from site. | |
01/18/2007 | GRADING - FINAL | Not ready for Inspection | Met with site super. Looked at scupper installation. | |
01/16/2007 | GRADING - FINAL | Denied | Complete punch list items #2, 3, 7, 8, 10, 12, 13, 14, 15, 18, 19 and 21. | |
12/12/2006 | GRADING - FINAL | Partial Approval | Contractor continues to work on punch list. | |
12/08/2006 | GRADING - FINAL | Not ready for Inspection | Punch List 1- Complete all fence and gate work. 2- Stabilize all areas distrubed by construction. 3- Complete all basin work. (Details A, B, C and D) 4- Complete all striping work. 5- Install wheel stops for HC parking. 6- Paint and strip bollards. 7- Install wheel stops parking area east and north sides. 8- Complete all grading around perimeter fence. 9- Repair down spouts. 10- Clean up construction debris. 11- Repair lip on HC ramp southwest corner of building. 12- Replace all broken curb. 13- Provide letter from engineer, per development standards and notes 44, 45 sheet 3. 14- Repair all holes in asphalt. 15- Remove trash dumpster and port-a-potty. 16- Complete all EX. curb work, south side of parking area. 17- Install trucated domes. (HC parking area) 18- Address parking southeast corner of parking lot. 19- Address detail 2/2 on sheet 3. 20- install handrail front of building. 21- Address ponding southeast corner of building next to HC parking. |
|
11/08/2006 | GRADING - FINAL | Not ready for Inspection | Spoke to site super in regards to HC installation needing trucated domes and scupper location. Contractor missed some scuppers. | |
10/31/2006 | GRADING - FINAL | Partial Approval | Met on site with Brain site super to discuss scupper installation and location. Also requirements for concrete wash. |