Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T06BU00980
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2006 | STORMWATER INSTALL OF CONTROLS | Approved | ITEMS IDENTIFIED ON THE PREVIOUS INSPECTION HAVE BEEN ADDRESSED. NO ADDITIONAL STORM WATER CONCERNS AT THIS TIME. |
|
09/21/2006 | STORMWATER INSTALL OF CONTROLS | Correction Required | INSTALL SEDIMENT CONTROLS PER LAST INSPECTION. 1) PULL STOCKPILE OF MATERIAL AWAY FROM FENCE AND DRAINAGE CHANNEL NORTH OF SITE. 2) INSTALL AN AB BIRM AT ENTRANCE/EXIT OF CULD DE SAC TO PREVENT SOIL FROM LEAVING THE SITE. 3) SWEEP CULD DE SAC ON A ROUTINE BASIS. 4) ESTABLISH A DESIGNATED CONCRETE/MATERIALS WASH OUT OUT ON SITE. COMPLY BY MONDAY 9/25/06, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |