Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) PROVIDE A SIGNED COPY OF YOUR NOI, HAVE AVAILABLE ON SITE. 2) REMOVE A PORTION OF THE STOCKPILED MATERIAL ALONG THE FENCE LOCATED TO THE NORTH OF THE PROJECT OR PLACE SEDIMENT CONTROLS AROUND THE NW CORNER. 3) INSTALL A SEDIMENT BARRIER IN PARKING AREA TO PREVENT SOIL FROM LEAVING THE SITE. 4) ROUTINELY SWEEP UP TRACKED MATERIAL PER YOUR STORM WATER PLAN. 5) INSTALL A CONCRETE/MATERIALS WASH OUT PER YOUR STORM WATER PLAN. |
|
| 06/08/2006 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection |