Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | NO SWPPP FOR SITE, GRADING WILL TAKE PLACE IN THREE PHASES. C OF O FOR ENGINEERING FOR EACH BLDG REQUIRED. NO STORM WATER CONCERNS AT THIS TIME, ASPHALT, AND CURBING AT THE PERIMETER OF THE SITE. |