Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 07/03/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO NEW STORM WATER CONCERNS AT THIS TIME | |
| 06/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IS NEAR COMPLETION AND IS MOSTLY STABILIZED. CONTINUE TO PROTECT ALL CATCH BASINS AND WALL OPENINGS UNTIL THE SITE IS 100% STABILIZED. | |
| 06/14/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) ALL CATCH BASINS AND WALL OPENINGS MUST BE PROTECTED WITH SEDIMENT CONTROLS UNTIL DIRT SPOILS FROM TRENCHING AND DIGGING ARE REMOVED AND THE SITE IS 100% STABILIZED. 2) ANY REVISIONS AND/OR CHANGES TO THE APPROVED GRADING PLAN MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE CITY OF TUCSON PRIOR TO FINAL GRADING APRROVAL. 3) A FINAL GRADING INSPECTION FOR PERMIT # T06BU00831 MUST ACCOMPLISHED AND APPROVED PRIOR TO C OF O. COMPLY BY TUE 6/19/07 |
|
| 03/06/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) ENSURE CONCRETE AND MORTAR WASTE MATERIAL IS CONTAINED ON SITE. 2) SWEEP UP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAY. 3) ENSURE EXISTING CATCH BASINS ON SITE ARE PROTECTED FROM SEDIMENT. 4) ENSURE STORM WATER MAINTENANCE SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER SWPPP. |
|
| 01/31/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. PERIMETER WALL BEING BUILT ON WEST SIDE. | |
| 01/09/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGES | |
| 12/14/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 11/16/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RE-ESTABLISH SEDIEMENT CONTROLS AROUND THE CATCH BASIN LOCATED ON THE NW CORNER OF THE SITE. | |
| 11/14/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION REQUIRED: 1) RE-ESTABLISH SEDIMENT CONTROLS AT ALL CATCH BASINS TO ENSURE COMPLIANCE WITH YOUR SWPPP. REPLACE OLD, WORN OUT STRAW BAILS. 2) CLEAN UP ALL WASTE PILES OF CONCRETE AND DISPOSED OF PROPERLY. COMPLY BY WED 11/15 |
|
| 07/20/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) ENSURE STRAW BAILS OR EQUIVALENT ARE PLACED AROUND ALL CATCH BASINS ON SITE TO PREVENT SEDIMENT FROM LEAVING THE SITE. 2) CONTINUE TO SWEEP UP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAYS. 3) ENSURE YOU COMPLETE YOUR STORM WATER MAINTENANCE SELF INSPECTIONS PER YOUR PLAN. 4) PROVIDE A DESIGNATED CONCRETE WASH OUT PER YOUR PLAN. |