Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | PRE-CONSTRUCTION MEETING ACCOMPLISHED. LLOYD CONSTR. CO 884-9821 1) MET WITH SUPERINTENDENT DISCUSSED SWPPP. 2) ONLY HALF THE SITE IS BEING WORKED AT THIS TIME, THE OTHER HALF IS OCCUPIED. ENSURE CONSTRUCTION AND THE PUBLIC ARE SEPARATED. 3) SEDIMENT CONTROLS ARE INSTALLED 4) CHANGES WERE MADE TO THE SWPPP DUE TO THE FACT THAT MOST OF THE SITE IS PAVED. 5) NOI AND SWPPP ARE AVAILABLE ON SITE. 6) MAY NEED SUPPLEMENTAL SEDIMENT CONTROLS AROUND STOCKPILED MATERIAL ON SITE. 7) ENSURE TORM WATER CONTROL MAINT SELF INSPECTIONS ARE PERFORMED. |