Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T06BU00724
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/14/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
08/03/2006 | ENGINEERING PRE-CONSTRUCTION | Correction Required | 1) CONCRETE WASH OUT HAS BEEN ESTABLISHED, HOWEVER THE WASH OUT MUST BE BERMED TO ENSURE CONCRETE AND MATERIAL STAY IN WASH OUT. 2) RE-ESTABLISH SEDIMENT CONTROLS ALONG SOUTH PERIMETER, SWEEP UP SOIL THAT HAS BEEN DISCHARGED OFF SITE. COMPLY BY FRIDAY 8/4/06, NON COMPIIANCE WILL RESULT IN A STOP WORK AND A STORM WATER CITATION. |
|
06/13/2006 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | STORM WATER CONTROLS HAVE BEEN INSTALLED AND THE STOP WORK ORDER HAS BEEN REMOVED. | |
06/13/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
06/09/2006 | ENGINEERING PRE-CONSTRUCTION | Violation | A STOP WORK ORDER WAS ISSUED FOR THE SITE. NO WORK IS ALLOWED ON THE SITE EXCEPT TO INSTALL SEDIEMNT CONTROLS PER THE APPROVED STORM WATER POLLUTION PREVENTION PLAN. | |
06/07/2006 | ENGINEERING PRE-CONSTRUCTION | Correction Required | NOTICE OF VIOLATION ISSUED: 1) FAILURE TO COMPLY WITH APPLICABLE AZPDES PERMIT AND STORM WATER POLLUTION PREVENTION PLAN. 2) IMPLEMENT SWPPP PRIOR TO THE START OF CONSTRUCTION. 3) PROVIDE A COPY OF AN APPROVED GRADING PLAN AND SWPPP ON SITE. 4) PROVIDE A SIGNED COPY OF YOUR NOI 5) CALL FOR A PRECON PRIOR TO THE START OF CONSTRUCTION. COMPLY WITH THE ABOVE LIST BY THURSDAY 6/8/06 OR A STOP WORK ORDER WILL BE ISSUED FOR THE SITE AND A CITATION WILL BE ISSUED UNDER THE CITY OF TUCSON STORM WATER ORDINANCE #10209. |