Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2008 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 08/20/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE STILL UNDER AZPDES PERMIT. MAJORITY OF SITE WORK DONE; HOWEVER SITE IS NOT COMPLETELY STABILIZED. ADD SEDIMENT CONTROLS AROUND STOCKPILE OF SOIL ON SOUTH SIDE OF SITE. |
|
| 07/10/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME, NO CHANGES TO SITE WORK SINCE LAST INSPECTION. | |
| 05/27/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SPOKE WITH SUPERINTENDENT ON INSPECTION RESULTS. | |
| 05/22/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) INSTALL EROSION PROTECTION ON ALL SLOPES GREATER THAT 3:1 AS SOON AS FEASIBLE. 2) COMPLY WITH ALL REQUIREMENTS UNDER YOUR SWPPP AND THE AZPDES PERMIT. |
|
| 04/08/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE PARTIALLY PAVED. BLOCK WALL ALONG PART OF THE PERIMETER. SITE MUST CONTIUE TO COMPLY WITH THEIR SWPPP UNTIL IT IS 100% PAVED AND LANDSCAPING IS INSTALLED. CONTINUE TO SWEEP UP SOIL THAT HAS BEEN TRACKED OFF SITE. |
|
| 03/07/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE: 1) SWEEP UP TRACKING FROM OFF SITE 2) RE-ESTABLISH CONSTRUCTION ENTRANCE 3) RE-ESTABLISH SEDIMENT CONTROLS ALONG PERIMETER SECOND NOTICE |
|
| 02/27/2008 | STORMWATER FOLLOW-UP INSP | Violation | 1) SWEEP UP TRACKING OFF OF ENTRANCE WAY AN ON SOUTH PERIMETER. 2) RE-ESTABLISH SEDIMENT CONTROLS AT STORM WATER OUTLET ALONG EAST SIDE, AND SOUTH ENTRANCE/EXIT. 3) RE-ESTABLISH A STABILIZED CONSTRUCTION ENTRANCE/EXIT. 4) CONTRACTOR MUST COMPLY WITH THE SWPPP UNTIL SITE IS 100% STABILIZED. 5) CALL FOR INSPECTION FOR ANY CHANGES MADE TO THE APPROVED GRADING PLAN. |
|
| 02/05/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | RAINING TODAY, SOME ACTIVITY ON SITE. SOME MAINT NEEDED ON SW CONTROLS |
|
| 01/16/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH PERIMETER STORM WATER CONTROLS ALONG THE EAST SIDE UNTIL SITE IS STABILIZED. 2) ENSURE SPOILS FROM WALL CONSTRUCTION ARE BROUGHT BACK ON TO SITE. 3) RE-INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT. 4) ENSURE STORM WATER SELF INSPECTION PERFORMED/DOCUMENTED. 5) SWEEP UP DIRT OFF OF PARK ENTRANCE ROUTINELY. 6) ENSURE WASTE CONCRETE IS WASHED OUT IN DESIGNATED AREA. |
|
| 10/10/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH/REPLACE PERIMETER SEDIMENT CONTROLS ON SITE. 2) RE-INSTALL YOUR STABILIZED CONSTRUCTION ENTRANCE. 3) CONTINUE TO PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS AS REQUIRED PER PLAN. 4) ENSURE CONCRETE WASH OUT IS ACCESSIBLE. |
|
| 08/16/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO NEW STORM WATER CONCERNS AT THIS TIME. | |
| 07/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) CONTINUE TO MONITOR SITE FOR DISTURBED SOIL DISCHARGES AND/OR POTENTIAL DISCHARGES OFF SITE. 2) CONTINUE TO INSPECT AND MAINTAIN SEDIMENT CONTROLS PER YOUR PLAN AND DOCUMENT IT. |
|
| 07/23/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) CLEAN UP SOIL USED TO COVER ELEC TIE-IN ON SOUTHSIDE. 2) RE-ESTABLISH GRAVEL BAGS AT DRAINAGE OUTLET 3) PROVIDE A CONCRTE WASH OUT ON SITE. 4) PROVIDE PROOF OF STORM WATER SELF INSPECTIONS |