Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 06/20/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | NO SIGNIFICANT CHANGES ASSOCIATED WITH STORM WATER AND SEDIMENT CONTROLS. CONTINUE TO MAINTAIN EXISTING CONTROLS AND FOLLOW YOUR SWPPP. | |
| 05/10/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | 1) PLACE SEDIMENT CONTROLS ALONG EAST AND NORTH PERIMETER AS SHOWN ON YOUR APPROVED SWPPP OR RE-ESTABLISH AND COMPACT EXISTING BIRM. 2) PULL SOIL AWAY FROM FENCE ALONG THE SOUTH PERIMETER. PLACE SEDIMENT CONTROLS ALONG EAST END OF SOUTH PERIMETER AND PLACE GRAVEL BAGS AT CURB LINE IN FRONT OF DRAINAGE OUTLET. 3) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE. 4) RE-ESTABLISH STABILIZE ENTRANCE/EXIT. 5) SWEEP UP TRACKED MATERIAL OFF OF ADJACENT PARKING LOT. 6) PERFORM PERIODIC STORM WATER SELF INSPECTIONS AS PRESCRIBED BY YOUR SWPPP AND DOCUMENT THEM. |
|
| 05/02/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | ||
| 04/10/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY |