Inspection History Details
Inspection Status: Closed
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T06BU00499
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Closed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/2020 | STORMWATER FOLLOW-UP INSP | Closed | THIS SITE IS BEING CLOSED AT THIS TIME FOR THE REASON THAT IT WAS NOT COMPLETED PER | |
08/28/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO ADDITIONAL STORM WATER CHANGES. | |
07/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO SIGNIFICANT DISCHARGE OF DISTURBED SOIL IS EVIDENT. NO OTHER STORM WATER CONCERNS AT THIS TIME. ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED PER PLAN AND DOCUMENTED. |
|
07/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) REMOVE CONSTRUCTION DEBRIS AND MATERIAL OFF OF SILT SOCK LOCATED ALONG THE NORTH WEST PERIMETER. 2) DO NOT WASH OUT WASTE MATERIALS INTO THE RET/DET BASIN AT NORTH SIDE OF SITE - MATERIALS WILL EFFECT THE PERC RATE OF BASIN AND MUST BE DISPOSED OF PROPERLY. |
|
06/18/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-INSTALL PERIMETER CONTROLS ALONG NW CORNER OF SITE - STORM WATER CONTROLS ARE REQUIRED UNTIL THAT AREA IS STABILIZED - LANDSCAPED, PAVED..... 2) CONTINUE TO MAINTAIN AND ADJUST CONTROLS ON A ROUTINE BASIS. 3) SWEEP UP TRACKING OFF OF THIRD ST. AS NEEEDED. |
|
05/15/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
04/10/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
04/02/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SEDIMENT CONTROLS HAVE BEEN INSTALLED ON PERIMETER OF SOUTH PROPERTY - PER YOUR SWPPP AND THE INSPECTOR AGREEMENT. 1) ENSURE YOU MAINTAIN CONTROLS THROUGHOUT THE DURATION OF THE PROJECT. 2) CONTINUE TO ROUTINELY SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAY. 3) ENSURE CONTROLS ALONG THE NW CORNER OF THE PROJECT ARE RE-INSTALLED AS SOON AS GRADES ARE ACHIEVED; AND UNTIL THE AREA IS PERMANENTLY STABILIZED. |
|
03/22/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SPOKE WITH CONTRACTOR TO DISCUSS SEDIMENT CONTROL INSTALLATION ON SOUTH PROPERTY PRIOR TO THE START OF CONSTRUCTION | |
03/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
02/22/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | ITEMS LISTED ON THE 2/8/07 INSPECTION HAVE BEEN ADDRESS. MET WITH SUPERINTENDENT OF SITE - DISCUSSED DEVELOPMENT OF PROPERTY LOCATED ON THE SOUTH SIDE OF 3RD ST. SEDIEMNT CONTROLS WILL BE INSTALLED PER THE SWPPP WITH THE EXCEPTIONS OF: FOLLOWING THE PERIMETER OF THE OUTER PERIMETER OF THE PROPERTY LINE ALONG THE NW CORNER , AND USING SILT FENCE IN PLACE OF FIBER ROLL ALONG NORTH SIDE. WILL RE-INSPECT THE INSTALLATION OF CONTROLS IN THREE WEEKS FROM THE DATE OF INSPECTION. |
|
02/08/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) CLEAN OUT CONCRETE WASH OUT 2) REMOVE ROCK AND DEBRIS FROM GUTTER, AND SWEEP UP TRACKING OFF OF 3 RD ST. 3) REMOVE CONSTRUCTION MATERIAL OFF OF SEDIMENT CONTROLS - NW CORNER. 4) PROVIDE SEDIMENT CONTROLS FOR STOCKPILED MATERIAL AT SOUTH PROPERTY. ENSURE MATERIAL STAYS ON SITE. COMPLY BY 2/21/07 NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION |
|
01/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
12/15/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAY DAILY. 2) ENSURE PERIODIC STORM WATER MAINTENANCE INSPECTIONS ARE ACCOMPLISHED PER YOUR STORM WATER PLAN. 3) PRIOR TO APPROVAL BY ENGINEERING FOR A C OF O, ENSURE ANY CHANGES MADE TO THE APPROVED GRADING/SITE PLAN ARE REVISED BY THE ENGINEER OF RECORD AND APPROVED BY THE CITY OF TUCSON. |
|
11/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | PROVIDE AN UPDATED STORM WATER PLAN AND CALL FOR INSPECTION WHEN THE PROJECT ON THE SOUTH SIDE OF THIRD STREET BEGINS. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
10/09/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME. SOUTH SIDE OF 3RD STREET PROJECT WILL START SOON. |
|
09/14/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | STORM WATER CONTROLS IN PLACE. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. ENSURE PERIODIC STORM WATER MAINTENANCE IS PERFOMED THROUGHOUT THE DURATION OF THE CONSTRUCTION. |