Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T06BU00245
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/14/2006 | STORMWATER INSTALL OF CONTROLS | Approved | 1) EXTEND WADDLE ALONG 1ST AVE PAST CATCH BASIN. 2) ADD STRAW BAILS AT ENTRANCE TO CATCH BASIN. 3) TALKED WITH SUPERINTENDENT/ TOLD INSPECTION RESULTS. 4) CONTINUALLY SWEEP TRACKING. |
|
06/08/2006 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) POST A COPY OF YOUR NOI AT ENTRANCE TO SITE. 2) RE-ESTABLISH ROCK ENTRANCE ROUTINELY, AS NEEDED. 3) SWEEP UP TRACKED MATERIAL OFF OF LIMBERLOST ROAD DAILY, UNTIL DIRT WORK IS COMPLETE. 4) ADD STRAW BAILS AROUND CATCH BASIN ALONG WEST SIDE OF SITE NEAR 1ST AVE. 5) WADDLE ALONG NORTHWEST CORNER OF SITE MUST BE CONTIUOUS, CONNECT OPENING OF SILT SOCK |
|
05/17/2006 | STORMWATER INSTALL OF CONTROLS | Partial Approval | WADDLE HAS BEEN INSTALLED ALONG THE NW CORNER OF THE SITE. STORM WATER APPEARS TO SHEET FLOW THAT DIRECTION ON SITE INTO CATCH BASINS LOCATED IN THE RIGHT OF WAY ALONG 1ST AVE. SEDIMENT CONTROLS PROTECT THE CATCH BASIN ALONG 1ST AVE AND TIE INTO AN EXISTING WALL. ROCK ENTRANCE WAS BEING INSTALLED TODAY. POSTING OF NOI AND A MATERIALS WASH OUT AREA WILL BE COMPLETED. |