Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T06BU00077
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Continued
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO NOTED CHANGES IN THE SITE AT THIS TIME. | |
| 12/02/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO NOTED CHANGES IN THE SITE AT THIS TIME. | |
| 09/20/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO NOTED CHANGES IN THE SITE AT THIS TIME. | |
| 04/01/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO NOTED CHANGES IN THE SITE AT THIS TIME. | |
| 11/03/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO NOTED CHANGES IN THE SITE AT THIS TIME. | |
| 05/08/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGE IN SITE | |
| 10/28/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGE IN SITE | |
| 10/03/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGE IN SITE MOSTLY STABLE-WEEDS/VEGETATION ON STOCKPILE |
|
| 08/14/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | MET ONSITE WITH MIKE GARDNER LOOKED AT ONSITE FLOW FROM DESERT POINT 2 AND DISCUSSED POSS SOLUTIONS TO PREVENT SEDIMENT FROM DEPOSITING IN STREETS LOOKED AT DRAINAGE ALONG ALVERNON WY AND DISCUSSED SCUPPER LOCATION |
|
| 08/02/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SWALE AT SOUTH SIDE OF STOCK PILE APPEARS TO BE CHANNELING/CONCENTRATING FLOW INTO DESERT POINT AND DEPOSITING SILT INTO THE STREET ON BIG GAME PL | |
| 07/24/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGE IN SITE SOME RUN OFF INTO DESERT POINT ONTO STREET/THRU COMMON AREA |
|
| 06/08/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGE IN SITE | |
| 03/13/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGE IN SITE | |
| 12/15/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGE IN SITE | |
| 11/16/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGE IN SITE | |
| 10/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RE-ESTABLISH SEDIMENT CONTROLS AT SOUTH SIDE OF STOCKPILE-PLACE CONTROLS OR RE-ESTABLISH V-DITCH | |
| 09/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RE-ESTABLISH V DITCH ON SOUTH SIDE OF STOCKPILE | |
| 08/08/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 3 DAYS TO CORRECT BERM ON SOUTH SIDE OF STOCKPILE NEEDS TO BE RE-ESTABLISHED |
|
| 07/31/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | BERM ON SOUTH SIDE OF STOCKPILE NEEDS TO BE RE-ESTABLISHED | |
| 07/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | BAR DITCH HAS NOT BEEN IMPROVED AT ALL NO CHANGES TO SITE |
|
| 06/15/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | BAR DITCH ALONG S SIDE OF STOCKPILE NEEDS TO BE DEEPENED TO CONTAIN SEDIMENTS OR OTHER SEDIMENT CONTROLS WILL NEED TO BE PLACED/INSTALLED |