Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T06BU00077

Parcel: 140321000


Addresses:

6133 S ANTRIM LP

Inspection Status: Continued

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
02/04/2011 STORMWATER FOLLOW-UP INSP Continued NO NOTED CHANGES IN THE SITE AT THIS TIME.
12/02/2010 STORMWATER FOLLOW-UP INSP Continued NO NOTED CHANGES IN THE SITE AT THIS TIME.
09/20/2010 STORMWATER FOLLOW-UP INSP Continued NO NOTED CHANGES IN THE SITE AT THIS TIME.
04/01/2010 STORMWATER FOLLOW-UP INSP Continued NO NOTED CHANGES IN THE SITE AT THIS TIME.
11/03/2009 STORMWATER FOLLOW-UP INSP Continued NO NOTED CHANGES IN THE SITE AT THIS TIME.
05/08/2009 STORMWATER FOLLOW-UP INSP Continued NO CHANGE IN SITE
10/28/2008 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE
10/03/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CHANGE IN SITE
MOSTLY STABLE-WEEDS/VEGETATION ON STOCKPILE
08/14/2007 STORMWATER FOLLOW-UP INSP Correction Required MET ONSITE WITH MIKE GARDNER
LOOKED AT ONSITE FLOW FROM DESERT POINT 2 AND DISCUSSED POSS SOLUTIONS TO PREVENT SEDIMENT FROM DEPOSITING IN STREETS
LOOKED AT DRAINAGE ALONG ALVERNON WY AND DISCUSSED SCUPPER LOCATION
08/02/2007 STORMWATER FOLLOW-UP INSP Correction Required SWALE AT SOUTH SIDE OF STOCK PILE APPEARS TO BE CHANNELING/CONCENTRATING FLOW INTO DESERT POINT AND DEPOSITING SILT INTO THE STREET ON BIG GAME PL
07/24/2007 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE
SOME RUN OFF INTO DESERT POINT ONTO STREET/THRU COMMON AREA
06/08/2007 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE
03/13/2007 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE
12/15/2006 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE
11/16/2006 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE
10/02/2006 STORMWATER FOLLOW-UP INSP Correction Required RE-ESTABLISH SEDIMENT CONTROLS AT SOUTH SIDE OF STOCKPILE-PLACE CONTROLS OR RE-ESTABLISH V-DITCH
09/18/2006 STORMWATER FOLLOW-UP INSP Correction Required RE-ESTABLISH V DITCH ON SOUTH SIDE OF STOCKPILE
08/08/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 3 DAYS TO CORRECT

BERM ON SOUTH SIDE OF STOCKPILE NEEDS TO BE RE-ESTABLISHED
07/31/2006 STORMWATER FOLLOW-UP INSP Correction Required BERM ON SOUTH SIDE OF STOCKPILE NEEDS TO BE RE-ESTABLISHED
07/05/2006 STORMWATER FOLLOW-UP INSP Correction Required BAR DITCH HAS NOT BEEN IMPROVED AT ALL
NO CHANGES TO SITE
06/15/2006 STORMWATER FOLLOW-UP INSP Correction Required BAR DITCH ALONG S SIDE OF STOCKPILE NEEDS TO BE DEEPENED TO CONTAIN SEDIMENTS OR OTHER SEDIMENT CONTROLS WILL NEED TO BE PLACED/INSTALLED