Inspection History Details
Inspection Status: Correction Required
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2006 | STORMWATER INSTALL OF CONTROLS | Correction Required | THERE IS A V DITCH CUT ON THE EAST AND WEST SIDE OF THIS STOCKPILE. THERE ARE NO SEDIMENT CONTROLS ON THE NORTH OR SOUTH SIDES OF THE PILE. | |
| 04/06/2006 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection | NO CHANGE IN SITE WORK IS CONTINUING ON REG DET BASIN NO WORK HAS OCCURRED IN THE EXSITING WASH AREA |
|
| 03/21/2006 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection | NO CHANGE IN SITE | |
| 03/06/2006 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection | NO WORK YET | |
| 02/10/2006 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection |