Inspection History Details
Permit: T06BU00050
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | ATTENDED PRE-CONSTRUCTION MEETING WITH THE GENERAL CONTRACTOR (CUTSHAW/YEAGER) AND THE SUBCONTRACTOR (JANC CONSTRUCTION), DISCUSSED THE APPROVED STORM WATER PLAN AND MAINTENANCE REQUIREMENTS. POINT OF CONTACTS FOR THIS PROJECT ARE CHIP JANTZ (609-0427) AND RUSS SALMON(240-8852). SWEEP UP TRACKING OFF OF LIMBERLOST ROUTINELY MAINTAIN STORM WATER CONTROLS PER PLAN CALL FOR INSPECTION WHEN CONTROLS ARE INSTALLED. |
|
| 06/08/2006 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection |