Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
| 12/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to clean up small amount of drywall wash out. | |
| 11/15/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | This is the 3rd inspection in regards to correction notice. Contractor still has not addressed items. I told Site super Randy from now on when a correction notice is not address with in the time given will issue re-fee. | |
| 11/13/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor given an extra 24 hours to clean wash out. | |
| 11/05/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued Correction Notice, contractor has 5 days to correct: 1- Make minor repairs to wattle. 2- Clean wash out from around site. 3- Provide wash out area for sub-contractors. If contractor does not address items will issue a Notice of Violation. Spoke to Randy site super in regards to issues. |
|
| 10/22/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean wash out from around site. Spoke to site super in regards to issues. |