Inspection History Details
Inspection Status: Violation
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2006 | INITIAL CODE VIOLATION | Violation | 1:45 P.M. MEETING WITH STEVE LONG, RAY MAJUTA, DAN SANTA CRUZ AND MYSELF BECAUSE OF VIOLATION OF STOP WORK ORDER AT PANEL OW ON EAST WALL OF 1145 E. VALENCIA. SOMEONE HAD, IN DIRECT VIOLATION OF STOP WORK ORDER POSTED ON ELECTRIC PANEL RECONNECTED POWER TO 1143 E. VALENCIA. THE CONNECTION POSES AN IMMINENT HAZARD TO THE WELFARE OF ANY PUBLIC OR PRIVATE ENTITIES THAT COULD COME IN CONTACT WITH THE ILLEGAL STRUCTURE AT 1143 E VALENCIA. AT 1:55 PM THE PROPERTY REPRESENTATIVE "BRENT" WAS CONTACTED AND NOTIFIED OF VIOLATION. HE STATED THAT DISCONNECTING POWER WOULD NOT BE AN ISSUE. SO D. SANTA CRUZ TURNED OFF BREAKER AND DISCONNECTED FEEDS. ANOTHER VIOLATION OF STOP WORK ORDER WILL RESULT IN METER DISCONNECT. |