Inspection History Details
Inspection Status: Closed
Inspection History: FOLLOW UP CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2005 | FOLLOW UP CODE VIOLATION | Closed | BUILDING FINAL BY GREER (5/26/05) 6/20/05 -- OK TO CLOSE CASE |
|
| 05/17/2005 | FOLLOW UP CODE VIOLATION | Violation | 5/11/05-PERMIT T05CM01212 ISSUED 3/23/05 WALL PTIO 2'-0" RETENTION WITH 6'-0" ON TOP AND ELECTRIC MOVE GAS METER PERMIT T03CM04782 ISSUED 12/22/03 ONE TIME EXTENSION. ADDITION BEDROOM AND BATHROOM ALL INTERMEDIATE INSPECTIONS APPROVED BY FRANK GREER WORK AT SHEET ROCK PROGRESS MADE FU 30 DAYS |