Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/04/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE A MIN. 10LB. PRESSURE TEST ON ENTIRE SYSTEM. ALL GAS APPLIANCES MUST BE BROUGHT UP TO CURRENT CODES IF THE METER IS LOCKED BY THE GAS CO. EXPOSE ALL NEW PIPING & FITTINGS - AN APPROVED TAPE PRIMER MUST BE USED PRIOR TO TAPING BURIED PIPE & FITTINGS -- PROVIDE ACCESS TO ALL GAS APPLIANCES. |