Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 12/28/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) FURNACE VENT MUST ALSO TERMINATE ABOVE COOLER. REMOVE TAPE AT TRANSITION OF SINGLE WALL TO DBL WALL VENT. SECURE WATER HEATER VENT CONNECTOR WITH SCREWS 2) PROVIDE WORKING TEMPERATURE AND PRESSURE RELIEF VALVE (VALVE DOES NOT OPEN) 3) PROVIDE AGA GAS VALVE FOR WATER HEATER 4) SUPPORT HORIZONTAL OVERHEAD PIPING AT METER 5) PROVIDE BONDING OF GAS PIPING (GROUND TO WATER) 6) RECALL FOR INSPECTION WHEN READY |