Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 10 PSI TEST FROM METER UNDERGROUND UP AT BUILDING THRU EXISTING SERVICE ENTRY TO STOVE/WATER HEATER/FURNACE OK |
|
| 01/25/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE A TEST GAUGE THAT HAS 1/10 POUND INCREMENTS AND PROVIDE TEST THAT HAS NO PRESSURE LOSS FOR 10 MINUTES. YOU ARE LEAKING SOMEWHERE. 2. PROVIDE PIPE PRIMER THEN 10 MIL TAPE AT ALL TOOL MARKS AND FITTINGS THAT ARE UNDERGROUND. 3. PROVIDE CORRECT BONDING OF BUILDING GAS PIPING #4 OR #6 WIRE. 4. PROVIDE 3-GALV SCREWS AT EACH JOINT OF WATER HEATER/FURNACE FLUE VENT PIPING. |
|
| 12/28/2005 | PLUMBING - GAS PRESSURE TEST | Cancelled | CANCELLED PER OWNER CARLA SILVA #406-0882 |