Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 12/29/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 9.9 PSI PRESSURE TEST ALL GAS PIPING, INCLUDING POOL HEATER ALA GAS VALVE MUST INSTALLED AHEAD OF FLEX CONNECTOR ALL EXPOSED HORIZONTAL PIPING MUST BE A MIN. OF 6" ABOVE GRADE USE PIPE PRIMER AND WRAP TOOL MAKRS & FITTINGS BELOW GRADE PROVIDE WEATHERPROOF SUPPORT ACROSS ROOF AT 8' AND AT CHANGES OF DIRECTION AGA VALVES REQUIRED AT APPLIANCES. BONDING OF GAS LINE REQUIRED REPRESSURE TEST RECALL FOR INSPECTION |