Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 20 PSI TEST FROM NEW METER LOCATION TO WEATER HEATER & FURNACE ONLY - OK (SW GAS 889-1888) |
|
| 12/20/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. RUN PIPING TO POINT OF TERMINATION AT VALVES IN ACCESSIBLE LOCATION SECURED PROPERLY FOR WATER HEATER & FURNACE - RETEST SYSTEM AND CALL IN FOR INSPECTION. 2. PROVIDE BONDING OF BUILDING GAS PIPING. |