Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* APPROVED 12 PSI TEST FROM METER OVERHEAD TO EXISTING SERVICE ENTRANCE TO WATER HEATER, FURNACE, OVEN & STOVE TOP -- GAS CARD AT METER 889-1888 |
|
| 12/20/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE APPROVED COUPLINGS AS REQUIRED 2. PROVIDE SUPPORTS ON PIPING AS REQUIRED 3. PROVIDE BONDING OF BUILDING GAS PIPING #4 4. PROVIDE DOUBLE WALL VENT MATERIAL AT PENETRATION THRU CEILING AND ROOF WITH 3-GALV SCREWS AT EACH JOINT OF VENT FROM WATER HEATER WITH APPROVED DOUBLE WALL VENT CAP AT LEAST 1' ABOVE TOP OF ROOF -- RETEST SYSTEM |
|
| 12/16/2005 | PLUMBING - GAS PRESSURE TEST | Cancelled | ||
| 12/16/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |