Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* PETITION OF APPEAL #2005-289 OK FOR GAS - CALL SW GAS @889-1888 |
|
| 12/20/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE TEST PRESSURE OF 1/2 THE GAUGE PRESSURE 2) PROVIDE 12" OF COVER TO PROTECT PIPE 3) PROVIDE BONDING OF GAS LINE (GROUND TO WATER) 4) JOINTS AND TOOL MARKS IN BELOW GRADE PIPING MUST BE PRIMERED AND WRAPPED 5) SECURE WATER HEATER VENT CONNECTOR WITH SCREWS 6) TEMPERATURE AND PRESSURE RELIEF VALVE MUST GRAVITY DRAIN TO EXTERIOR OR OBTAIN A PETITION OF APPEAL FOR ALTERNATE T & P LOCATION FROM 201 NORTH STONE AVE 7) THIS WILL REQUIRE A DRAIN PAN UNDER WATER HEATER AND A PRESSURE RELIEF VALVE INSTALLED AT AN EXTERIOR HOSE BIB 8) RECALL FOR INSPECTION |