Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/16/2005 | PLUMBING - FINAL | Not ready for Inspection | 03050 - 10 PSI TEST NEW PIPING UNDERGROUND UP AT BUILDING TO FURNACE, WATER HEATER, DRYER (ONLY) 03090 - 1. PROVIDE 3-GALV SCREWS AT JOINT FROM SINGLE TO DOUBLE WALL CONNECTION AT FURNACE. 2. PROVIDE PIPE AT PENETRATION THRU FURNACE HOUSING 3. PROVIDE MINIMUM 1" CLEARANCE FROM WATER HEATER FLUE VENT AND COMBUSTABLES 4. PROVIDE MINIMUM 100 SQ INCH UPPER COMBUSTION AIR OPENING FOR WATER HEATER 5. PROVIDE CORRECT BONDING OF BUILDING GAS PIPING. |
|
| 12/15/2005 | PLUMBING - FINAL | Denied |