Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 1/2" GAS LINE TO 125000 BTU FURNACE DOES NOT APPEAR TO BE SIZED CORRECTLY AT ? 80' 2) PROVIDE APPROVED DRAWING FOR COMMERCIAL GAS LINE 3) PROVIDE CLEARANCE BETWEEN VENT AND COMBUSTIBLE MATERIALS 4) REMOVE TAPE FROM TRANSITION OF VENT CONNECTOR TO BE VENT 5) SEAL PIPING PENETRATION TO BLDG 6) PROVIDE BONDING OF GAS LINE 7) REMOVE TEE (? FOR FUTURE) BEFORE FURNACE 8) SECURE PIPING AT DROP FOR FURNACE AND AT EXTERIOR PIPING WHERE OLD CLAMPS HAVE BECOME LOOSE |