Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/06/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE BONDING OF BUILDING GAS PIPING 2. PROVIDE AGA OR CSA APPROVED GAS VALVE AT WATER HEATER 3. PROVIDE 3 GALV SCREWS AT CONNECTIONS OF ALL VENT PIPING OF APPLIANCES. 4. PROVIDE AGA OR CSA APPROVED GAS VALVE AT FURNACES 5. PROVIDE APPROVED COUPLING AT FLEX CONNECTION TO FURNACE. 6. WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING TO GRAVITY DRAIN TO DAYLIGHT OR HAVE CITY SIGNED PETITION OR APPROVAL FOR ALTERNATE FORM OF TEMPERATURE & PRESSURE RELIEF ON SITE WITH CORRECT INSTALLATION |