Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 04/18/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTES ABOVE (FROM PREVIOUS INSPECTION) 1. PROVIDE TEST GAUGE WITH TEST ON ENTIRE GAS PIPING SYSTEM AT TIME OF INSPECTION. 2. PROVIDE MINIMUM 12" OF COVER ON UNDERGROUND GAS PIPING. 3. PROVIDE PIPE PRIMER THEN TAPE ALL UNDERGROUND FITTINGS & TOOL MARKS. 4. PROVIDE APPROVED COUPLING FOR GAS PIPING. THREAD PROTECTORS ARE NOT APPROVED. 5. SUPPORT GAS PIPING ON EXTERIOR OF HOUSE AT ENTRY AREA. 6. EXPOSE ALL GAS PIPING FOR INSPECTION. |
|
| 12/21/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) ALL VALVES TO BE AGA OR CSA APPROVED 2) MAKE ALL CONNECTIONS-TEST ENTIRE SYSTEM. SYSTEM TO HAVE TEN POUNDS GAUGE PRESSURE WHEN INSPECTOR ARRIVES, DOES NOT TEST THRU APPLIANCES 3) REQUIRE A BOND BETWEEN WATER AND GAS PIPING (AT WATER HEATER) 4) CALL IN ALL REQUIRED INSPECTIONS |