Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05PL01944

Parcel: 134260980

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
10/03/2006 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
04/18/2006 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
SEE NOTES ABOVE (FROM PREVIOUS INSPECTION)
1. PROVIDE TEST GAUGE WITH TEST ON ENTIRE GAS PIPING SYSTEM AT TIME OF INSPECTION.
2. PROVIDE MINIMUM 12" OF COVER ON UNDERGROUND GAS PIPING.
3. PROVIDE PIPE PRIMER THEN TAPE ALL UNDERGROUND FITTINGS & TOOL MARKS.
4. PROVIDE APPROVED COUPLING FOR GAS PIPING. THREAD PROTECTORS ARE NOT APPROVED.
5. SUPPORT GAS PIPING ON EXTERIOR OF HOUSE AT ENTRY AREA.
6. EXPOSE ALL GAS PIPING FOR INSPECTION.
12/21/2005 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
1) ALL VALVES TO BE AGA OR CSA APPROVED
2) MAKE ALL CONNECTIONS-TEST ENTIRE SYSTEM. SYSTEM TO HAVE TEN POUNDS GAUGE PRESSURE WHEN INSPECTOR ARRIVES, DOES NOT TEST THRU APPLIANCES
3) REQUIRE A BOND BETWEEN WATER AND GAS PIPING (AT WATER HEATER)
4) CALL IN ALL REQUIRED INSPECTIONS