Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 12/09/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* PRESSURE IS AT 6 PSI WITH A 60 PSI GAGE GAGE MUST HAVE 1/10 PSI INCREMENTS. PIPING PENETRATIONS SHALL BE SEALED - PROVIDE BONDING OF GAS LINE WH VENT CONNECTOR SHALL BE SECURED W/SCREWS PLUG ABANDON GAS PIPING |
|
| 12/06/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*APPROVED ROOF FLASHING REQUIRED AT ROOF PENETRATION RE PRESSURE TEST AFTER INSTALLING FLASHING PIPE SUPPORTS ACCROSS ROOF MUST BE WEATHER RESISTANT CONNECT APPLIANCES FOR FINAL INSPECTION. BONDING OF GAS LINE REQUIRED INSTALL WATER HEATER PRIOR TO GAS INSPECTION PROVIDE TEMPERATURE & PRESSURE RELIEF PIPING OF APPROVED MATERIALS TO EXTERIOR, AND PROPER VENTING |