Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/26/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PLEASE HAVE AN ADULT PRESENT TO PROVIDE ACCESS ON ANY OF REINSPECTIONS -- 8:32 |
|
| 01/03/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. TEMPERATURE PRESSURE RELIEF DRAIN TO GRAVITY DRAIN TO DAYLIGHT 2. VENT FROM WATER HEATER TO HAVE 3-GALV SCREWS AT EACH JOINT, HAVE 1" MINIMUM CLEARANCE FROM COMBUSTIBLES AT PENETRATION THRU ROOF AND HAVE APPROVED VENT CAP. 3. PROVIDE MINIMUM 100 SQ. INCHES UPPER & LOWER COMBUSTION AIR OPENINGS FOR WATER HEATER. |