Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 10 PSI TEST FROM MOTOR UNDERGROUND TO EXISTING SERVICE ENTRANCE TO ROOFTOP UNIT & WATER HEATER ONLY |
|
| 12/09/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* TEST TO HOLD FOR 15 MINUTES WITH NO DROP. PRIME THEN TAPE ALL UNDERGROUND TOOK MARKS & FITTINGS SEE LIST ABOVE, COMPLETE ALL ITEMS THEN CALL FOR INSPECTION. |
|
| 12/02/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 11/30/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*10 PSI TEST SHALL HOLD WITH NO PRESSURE LOSS FOR 15 MINUTES. VENT FROM WATER HEATER TO HAVE 3 GALV SCREWS AT EACH JOINT AND BE INSTALLED CORRECTLY. PROVIDE BONDING OF BUILDING GAS PIPING. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN TO BE RIGID FULL SIZE PIPING GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE WITH CORRECT INSTALLATION. PROVIDE AGA OR CSA APPROVED GAS VALUES AT APPLIANCES. PROVIDE COUPLING AT ROOF TOP UNIT PIPING AND SUPPORT SECURE GAS PIPING AT THAT LOCATION. |