| 09/29/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* VACUUM TEST MANHOLE #4 OK VACUUM TEST MANHOLE #5 OK VACUUM TEST MANHOLE #6 OK VACUUM TEST MANHOLE #7 OK VACUUM TEST MANHOLE #2 RETEST OK VACUUM TEST MANHOLE #3 OK WAITING ON AUTHORIZATION TO DISCHARGE TO FINAL. |
|
| 08/17/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM MANHOLE #4 TO #5 AIRTEST 8" SDR 35 OK FROM MANHOLE #5 TO CLEANOUT LOT #11 AIRTEST OK FROM MANHOLE #5 TO CLEANOUT LOT #12 AIRTEST OK FROM MANHOLE #7 TO CLEANOUT LOT #15 AIRTEST OK FROM MANHOLE #7 TO CLEANOUT LOT #16 AIRTEST OK FROM MANHOLE #6 TO #7 AIRTEST OK 8" SDR 35. |
|
| 07/19/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* AIR TEST FROM MANHOLE #1 TO #2 OK AIR TEST FROM MANHOLE #2 TO #6 OK AIR TEST FROM MANHOLE #2 TO #3 OK AIR TEST FROM MANHOLE #3 TO #4 INCLUDING HCS LATERALS OK AIR TEST FROM MANHOLE #4 TO #5 INCLUDING HCS LATERALS DENIED |
|
| 05/03/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM MANHOLE #1 TO #2 AND FROM MANHOLE #6 TO #7 BEDDING, SHADING, LAYING, TRACER OK INCLUDING HCS LATERALS AS PER PLAN. SEE NOTES AT INSPECTION DEATED 4/27/06 |
|
| 05/02/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM MANHOLE #4 TO #5 8' SEWER BEDDING, SHADING, LAYING TRACER OK NEED PIMA COUNTY DETAIL FOR HCS LATERAL CONNECTIN TO MAIN |
|
| 04/27/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM MANHOLE #2 TO #3 BONDING, LAYING, SHADING, TRACER OK #2 TO #6 BEDDING, SHADING, LAYING, TRACER OK FROM #3 TO #4 BEDDING, LAYING, TRACER OK WILL NEED AIR TEST ON PIPING, VACUUM TESTING ON MANHOLE, VERIFICATION OF GRADE, AUTHORIZATION TO DISCHARGE FROM ADEQ AT LATER DATE. |
|
| 03/31/2006 | SITE - SEWER | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE TRACER WIRE AND EXPOSE ALL PIPING FOR INSPECTION. |