Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/07/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* CORRECTION HAVE BEEN MADE OK FOR GAS CALL SW GAS @ 889-1888 |
|
| 12/01/2005 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* PRESSURE TEST OK STOVE, BONDING, UNION REQUIREMENTS OK TEMPERATURE, PRESSURE RELIEF DRAIN MUST TERMINATE VERICALLY, AND MUST BE OF ONE OF THE FOLLOWING APPROVED MATERIALS. CPVC, GALV OR COPPER. PVC IS NOT ACCEPTED. PLEASE REACALL FOR FINAL INSPECTION. |
|
| 11/29/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*REMOVE UNION AHEAD OF VALVE AT W.H PROVIDE BONDING OF GAS LINE. INSTALL T & P DRAIN TO EXTERIOR REMOVE FLEX FROM INSIDE FIRE BOX OF STOVE. RE PRESSURE TEST. |