Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/30/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*PROVIDE 10 PSI PRESSURE TEST SECURE IPING ON EXTERIOR OF BUILDING SUPPORT PIPNG ON ROOF , MIN 1 1/2" CLEARANCE REQUIRED. BONDING OF GAS PIPE. PROVIDE CLEARANCE BETWEEN GAS & WATER PIPING WATER HEATER REQUIRES VENT CONNECTOR PROVIDE CLEARANCE 6" BETWEEN SINGLE WALL VENT PIPE AND COMBUSTIBLE MATERIAL. SEAL WALL PENETRATIONS TERMINATE TEMPERATURE & PRESSURE RELIEF DRAIN 6" -18" ABG. ROOF PENETRATIONS REQUIRE FLASHINGS |