Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*GAS PRESSURE TEST IS OK ALL CORRECTIONS HAVE BEEN MADE OK TO BACKFILL THE TRENCH |
|
| 12/19/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*SHALL REMOVE ALL TRHEAD PROTECTORS FROM GAS LINE AND REPLACE WITH APPROVED COUPLINGS PRIMER & TAPE COUPLINGS UNDER GROUND SHALL PROVIDE A GAS SHT FF VALVES BEFORE THE UNION FOR THE GAS LINE THAT GOES UP ON ROOF. SHALL PROVIDE A MIN OF # 6 GROUND WIRE AND BOND THE GAS LINE TO ELECTRIC PANEL OF GROUNDED WATER LINE SHALL PROVIDE GLAV.2 HOLE STRAPS FOR GAS LINE ON ROOF RE TEST THE SYSTEM. |