Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T05PL01811
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*PROVIDE GRAVITY DRAIN TO DAYLIGHT FOR TEMPERATURE & PRESSURE RELIEF FROM WATER HEATER, OR PROVIDE SIGNED PETITION OF APPEAL ON SITE WITH CORRECT INSTALLATION FOR ALTERNATE FORM OF T & P RELIEF | |
| 11/17/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*TEST SHALL HOLD MIMINUM 10 PSI FOR 15 MINUTES WITH NO PRESSURE DROP. NO PIPING SHALL BE RAN UNDER GROUND, UNDER ANY BUILDING OR STUCTURE PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES. REMOVE TAPE FROM DRAFT SPACE AT SINGLE TO DOUBLE WALL CONNECTION ON VENTS FROM WATER HEATER & FURNACE VENT FROM WATER HEATER SHALL RUN IN UPWARD DIRECTION TO POINT OF TERMINATION REMOVE TEE FITTING AT EXTERIOR DRYER LOCATION. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING TO BE RIGID AND GRAVITY DRAIN TO DAYLIGHT TERMINATING AT 90 DEGREE DOWN |