Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/07/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 03050 -- 10 PSI TEST ON EXISTING PIPING FROM METER TO WATER HEATER, CAPPED VALVE FOR DRYER, FURNACE ONLY OK SEE NOTES FROM 1/25/06 INSPECTION AND COMPLY WITH ALL ITEMS. 1. PROVIDE FULL SIZE RIGID PIPING FOR WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING. 2. PROVIDE BONDING OF BUILDING GAS PIPING. |
|
| 02/06/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTES FROM 1/25/06 INSPECTION -- YOUR TEST GAUGE ONLY HAS 1/2LB PRESSURE ON IT. |
|
| 02/02/2006 | PLUMBING - GAS PRESSURE TEST | Cancelled | CANCELLED PER BRIAN REPRESENTATIVE OF OWNER #312-6852 | |
| 02/02/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |