Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/21/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* WATER HEATER FLUE VENT PIPING SHALL BE DOUBLE WALL TO BE WITHIN 1" OF COMBUSTIBLE MATERIALS WITH 3- GLAV SCREWS AT EACH JOINT RISING MINIMUM 5' FROM DRAFT HOOD, TERMINATING MINIMUM 1' ABOVE ROOF WITH METAL FLASHING AND APPROVED VENT CAP. WALL HEATER TO HAVE APPROVED GAS SHUT OFF VALVE WITHIN 3' OF APPLIANCE IN SAME ROOM AS HEATER. PROVIDE 100 SQ INCH UPPER & LOWER COMBUSTION AIR OPENINGS WITH LOUVERS FOR WATER HEATER |