Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*20 PSI TEST FROM METER UNDERGROUND TO FUTURE WATER HEATER & FURNACE & WALL HEATER OK GAS CARD AT METER |
|
| 11/21/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*NOT READY, 10 PSI TEST SHALL HOLD MINIMUM 15 MINUTES WITH NO PRESSURE LOSS. | |
| 11/14/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*GAS PIPING MAY NOT BE INSTALLED UNDERGROUND UNDER ANY BLDG. FINISH PIPING. MAKE ALL CONNECTIONS PROVIDE APPROVED GAS PLAN, SHOWING DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION. PROVIDE BOND BETWEEN GAS AND WATER. OK METER WILL RELOCATE APPROX SIX FEET.NEW GAS PIPING THROUGHOUT. |