Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/04/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*PROVIDE MINIMUM 10 PSI TEST TO HOLD FOR 15 MINUTES WITH NO LOSS OF PRESSURE AT TIME OF REINSPECTION PROVIDE UPPER COMBUSTION AIR OPENING IN DOOR MINIMUM 10" X 10" WITH ?? + 100SQ INCHES PROVIDE WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN TO GRAVITY DRAIN TO DAYLIGHT PROVIDE CORRECT VENT FITTINGS FOR WATER HEATER & FURNACE WITH 3-GALV SCREWS AT EACH JOINT |