Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*GAS PRESSURE TEST OK ALL CORRECTIONS HAVE BEEN MADE |
|
| 10/31/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*12 PSI TEST FROM METER UP OVERHEAD TO ROOF TOP UNIT, STOVE & WATER HEATER OK SEE NOTES ON THIS PAGE ABOVE AND COMPLY NOT READY |
|
| 10/27/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*NO ACCESS PLEASE HAVE AN ADULT PRESENT TO PROVIDE ACCESS AT TIME OF REINSPECTION. GAS PIPING UNDERGROUND SHALL HAVE FITTINGS AND TOOL MARKS PRIMED THEN TAPED WATER HEATER REQUIRES DRAFT HOOD VENT FROM WATER HEATER REQUIRES 3-GLAV SCREW AT EACH JOINT AND 1" CLEARANCE FROM COMBUSTIBLES PROVIDE APPROVED VENT CAP FOR WATER HEATER. PROVIDE BONDING OF BUILDING GAS PIPING THIS IS NOT A COMPLETE LIST. |