Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*15 PSI TEST FROM METER OVEHEAD TO FURNACE STOVE, WATER HEATER OK. GAS CARD AT METER. | |
| 10/21/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE MINIMUM 10 PSI TEST TO HOLD WITH NO PRESSURE LOSS FOR 15 MINUTES 2) VENT FROM FURNACE TO BE MADE UP CORRECTLY AT SINGLE TO DBL WALL CONNECTION WITH 3-GALV SCREWS AT EACH JOINT OF ALL APPLIANCES VENT PIPING 2) SUPPORT GAS PIPING TO FURNACE 3) WATER HEATER TEMPERATURE AND PRESSURE RELIEF TO GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE WITH CORRECT INSTALLATION FOR ALTERNATE FORM OF T & P RELIEF |