Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/18/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE CORRECT VENT THRU ROOF WITH APPROVED VENT CAP AT WATER HEATER AND FURNACE LOCATION. SINGLE WALL TO CONCRETE TRANSITE PIPE IS NOT AN APPROVED METHOD FOR VENTING TRANSITION 2) PROVIDE BONDING OF BLDG GAS PIPING 3) PROVIDE MINIMUM ? ON T & P DRAIN FROM WATER HEATER AND SECURE PIPING |