Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05PL01651

Parcel: 120071300

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
11/03/2005 PLUMBING - FINAL Approved IVRS - Inspection :*
11/01/2005 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*APT #2 PRESS TEST AT GAUGE. 4.5PSI NEEDS TO MAINTAIN 10 PSI MIN.
CUT 4" X4" ELECT RISER FROM NEW WATER HTR VENT
10/26/2005 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999* VENT FROM WATER HEATER TO TRAVEL IN UPWARD DIRECTION AND HAVE 1" CLEARANCE FROM COMBUSTIBLES. REMOVE TAPE FROM SINGLE TO DOUBLE WALL CONNECTION. SEE NOTE #3 FROM 10/14/05
REMOVE TEE CONNECTION THAT IS PLUGGED OR PROVIDE CITY APPROVED PLAN OF THIS FUTURE CONNECTION
SEE NOTE #6 10/14/05 INSPECTION
PROVIDE APPROVED COUPLINGS ON GAS PIPING THREAD PROTECTORS ARE NOT APPROVED
NOW PVC SCH 40 PIPING IS NOT APPROVED FOR HOT WATER PIPING
SEE NOTE #8 FROM 10/14/05
10/18/2005 PLUMBING - FINAL Cancelled IVRS - RI canceled
10/14/2005 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) MINIMUM 10 PSI PRESSURE TEST SHALL BE ON GAS SYSTEMS AT TIME OF INSPECTION AND HOLD WITH NO PRESSURE LOSS FOR 15 MINUTES
2) NO GAS PIPING SHALL BE UNDEGROUND BENEATH A BLDG OR STRUCTURE
3) WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES AND COUPLINGS SHALL BE USED
4) WATER HEATERS TO BE IN WEATHER PROOF ENCLOSURES
5) WATER HEATER TEMPERATURE AND PRESSURE RELIEF DEVICE TO HAVE GRAVITY DRAIN TERMINATING 6"-24" FROM FINISH GRADE
6) WATER HEATER TO HAVE APPROVED FLUE VENT PIPING MINIMUM OF 5' WITH APPROVED VENT CAP AND HAVE 3 GALV SCREWS AT EACH JOINT OF PIPING TERMINATING AT APPROVED LOCATION
7) PROVIDE APPROVED GAS FLEX FOR STOVE
8) PROVIDE BONDING OF BUILDING GAS PIPING