Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/01/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*APT #2 PRESS TEST AT GAUGE. 4.5PSI NEEDS TO MAINTAIN 10 PSI MIN. CUT 4" X4" ELECT RISER FROM NEW WATER HTR VENT |
|
| 10/26/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* VENT FROM WATER HEATER TO TRAVEL IN UPWARD DIRECTION AND HAVE 1" CLEARANCE FROM COMBUSTIBLES. REMOVE TAPE FROM SINGLE TO DOUBLE WALL CONNECTION. SEE NOTE #3 FROM 10/14/05 REMOVE TEE CONNECTION THAT IS PLUGGED OR PROVIDE CITY APPROVED PLAN OF THIS FUTURE CONNECTION SEE NOTE #6 10/14/05 INSPECTION PROVIDE APPROVED COUPLINGS ON GAS PIPING THREAD PROTECTORS ARE NOT APPROVED NOW PVC SCH 40 PIPING IS NOT APPROVED FOR HOT WATER PIPING SEE NOTE #8 FROM 10/14/05 |
|
| 10/18/2005 | PLUMBING - FINAL | Cancelled | IVRS - RI canceled | |
| 10/14/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MINIMUM 10 PSI PRESSURE TEST SHALL BE ON GAS SYSTEMS AT TIME OF INSPECTION AND HOLD WITH NO PRESSURE LOSS FOR 15 MINUTES 2) NO GAS PIPING SHALL BE UNDEGROUND BENEATH A BLDG OR STRUCTURE 3) WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES AND COUPLINGS SHALL BE USED 4) WATER HEATERS TO BE IN WEATHER PROOF ENCLOSURES 5) WATER HEATER TEMPERATURE AND PRESSURE RELIEF DEVICE TO HAVE GRAVITY DRAIN TERMINATING 6"-24" FROM FINISH GRADE 6) WATER HEATER TO HAVE APPROVED FLUE VENT PIPING MINIMUM OF 5' WITH APPROVED VENT CAP AND HAVE 3 GALV SCREWS AT EACH JOINT OF PIPING TERMINATING AT APPROVED LOCATION 7) PROVIDE APPROVED GAS FLEX FOR STOVE 8) PROVIDE BONDING OF BUILDING GAS PIPING |