Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/12/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES & COUPLINGS SHALL BE USED INLINE PIPNG OR PROVIDE BUILDING AGA OR CSA APPROVED GAS SHUT OFF VALVE PROR TO UNION AT SERVICE ENTRANCE COMPLETE GAS PIPING TO WATER HEATER & FURNACE, PROVIDE AGA OR CSA GAS APPLIANCE SHUT OFF VALVES FOR EACH APPLIANCE WITH LISTED FLEX FOR EACH APPLIANCE. NOTE PROVIDE APPLIANCE PULL SPACE IN WATER HEATER/FURNACE LOCATION PROVIDE BONDING OF BUILDING GAS PIPING VENT FROM WATER HEATER TO BE DOUBLE WALL 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH APPROVED CAP. PROVIDE 3 GALV SCREWS AT EACH JOINT OF WATER HEATER/FURNACE VENT PIPING. |